Tiga Daun Projects

OUR WORK

Explore Recent Projects

N2 Alternative Assesment (2023)

Reclaimer Assesment  (2023)

Energy Audit for Cement Plant and Power Plant Facility (2021)

Coal Mill Assesment (2020)

Technical Assistance for Coal Mill System  (2018)

CCP1 Coal Plant Training (2012)

OUR WORK

Explore More Projects

Training Design Development System for Utilities (2014)

Workshop Coal Mill PTVI (2019)

Workshop Coal Mill PTVI (2019)

Feasibility Study Upgrade Cement Mill (2013)

OUR WORK

Audit Energi Plant Projects

Audit Energi Plant Narogong (2019)

Audit Energi Plant Tuban  (2019)

Audit Energi Plant Cilacap (2019)

Audit Energi Cement Plant –  Power Plant Lhoknga Aceh (2019)

Tiga Daun Project Reference - Partly

  • PT Vale Indonesia Tbk.

    Basic Desugn & Detail Engineering Design and HAZOP Analysis: CO2 & Nitrogen Generation System for Coal Mill Safety Protection System:

    1. Install Gas recirculating as primary air in coal Mill heater
    2. Cover all cable tray at coal mill building with fire resistance cover
    3. Install new Blow pipe using nozzle
    4. Install Cardax system to enter coal mill building
    5. Implement ATEX standart for lighning, electric plug, electric switch, sensor and personal CO sensor
    6. Replace dust inerting facilities
    7. Install explosion vent for bag house in coal raw bin and surge bin
    8. Install CO2 Vapor system in bottom raw and Middle coal bin, bottom and middle surge bin all dryer
    9. HAZOP Analysis
    10. Ntrogen System design to supply Coal Mill, Dryer, Kiln
  • PT Vale Indonesia Tbk.

    Technical Feasibility Study of Reclaimer Installation at DOS#1 and DOS#2,

  • PT Vale Indonesia Tbk.

    Kiln Off gas Installation as N2 Alternative for Coal Mill Safety System

  • Consortium Mitra Waskita Sarana PT Waskita Karya Infrastruktur, PT MKR (BUMD), PT KSBW

    Feasibilty Study and Tender Documents Preparation for Municipal Solid Waste Management Infrastructure Arrangement, Tangerang Regency with RDF technology – Gasification Power Plant – Capacity 2500 tpd

  • PT Vale Indonesia Tbk.

    Technical assistance to the maintenance and operational systems coal mill

  • PT Vale Indonesia Tbk.

    Coal Mill Overhaul Support Service

  • PT Cemindo Gemilang Tbk.

    Energy Audit for Cement Plant and Power Plant Facility (Scope Audit : Cement Port/Jetty, Raw Mill, Kiln, Cement Mill, and Power Plant)

  • PT Vale Indonesia Tbk.

    Technical assistance to the maintenance and operational systems coal mill

  • PT. MBP international to support PT. Amarta Karya (Persero) and PT IKPT

    Technical Design RDF Plant Capacity 1000 tpd Fresh Waste + 1000 tpd Landfill Mining Waste (Mechanical Drying) DKI Jakarta

  • PT MGGS

    Technical Design RDF Plant (Mechanical Drying) Capacity 1,000 tpd Tangerang Regency

    Technical Design RDF Plant (Mechanical Biological Treatment) Capacity 2,000 tpd West Jakarta

    Technical Design RDF Plant (Mechanical Drying) Capacity 2,000 tpd at TPA Bantar Gebang

Tiga Daun Project Reference - Partly

  • PT Solusi Bangun Indonesia Tbk Energy Audit for Narogong Plant, Tuban Plant, Cilacap Plant and Lhoknga Plant (Scope Audit : Raw Mill, Kiln, Cement Mill, and Power Plant)
  • PT Indocement Tunggal Prakarsa ILC Calciner Modification and Supervisory for Installation in Operation Division at Plant 12 – Tarjun
  • PT Vale Indonesia tbk. CCP1 – Coal Plant Training and Comissioning Service
  • UNEP DTU ADMIRE Cement NAMA; Reducing CO2 and Closing the Waste Gap; Encouraging Waste-to-Energy in the Indonesian Cement Sector and RDF as Alternative Fuel
  • PT Solusi Bangun Indonesia Tbk. Cilacap Regency Gov, Danish EmbassyFeasibility Study RDF Plant in Cilacap – Cooperation between Cilacap Regency Government and PT Holcim Indonesia Tbk, (2016) Client
  • Technical Audit Plant Tonasa IV Thermal Audit Plant Tonasa II, Tonasa III and Tonasa V
  • PT Semen Padang Modification of Kiln Riser Duct Plant Indarung 2/3Design of Fine Coal Feeder Kiln Plant Indarung 2/3
  • PT Semen Kupang Feasibility Study of New Greenfield Cement Plant
  • Adidas Energy Audit ISO 50001
  • PT Holcim Indonesia Tbk. Modification ILC Burner Plant Narogong 1
  • PT Solusi Bangun Indonesia Tbk.Benchmark and Energy Audit: Plant Narogong 1 & 2 – West Java, Plant Lhok Nga – Aceh Plant Tuban 1 & 2- East Java and Plant, Cilacap – Central Java
  • PT Vale Indonesia Tbk.Technical Assisstance for Coal Mill System Operation and Maintenance
  • PT Indocement Tunggal ParakasaSupervisory for Installation in Operation Division at Plant 12 – Tarjun
  • PT Semen KupangAssess existing performance equipment and to indentified potential improvement saving Market feasibility Study of New Cement Plant
  • PT Bengalon Limestone & TaehiyoFeasibilty Study of New Cement Plant in East Kalimantan
  • PT Adhikarya

    As sub contactor of PT Adhikari

    Waste to Energy Project Study – Pre Feasibility RDF Plant Capacity 1000 tpd Waste at TPPAS Cirebon, Indramayu

    Pre-Feasibility Study MSW to Power Plant (PLTSa) Facility at TPPAS Bekasi Capacity 1000 tpd

    Waste Management Analysis in TPA Piyungan and Waste Characteristics in Yogyakarta, Sleman, and Bantul